Wednesday, May 31, 2017

An Intentional Slowdown

Yes, if you were wondering why we're not about to move in things have been intentionally slowed down.  We're beyond the first closing date.  But, we've not sold the Island house yet, and the builder asked if he could focus on a few homes for folks who need to get in quickly, as well as the upcoming Parade of Homes, which is the builders chance to show off.

Today we got the second coating of stucco, which goes to hold down the molding.   That needs to dry -- a couple of days -- then the top coat with color will be done.

Here (on the right ) is the Master shower tile.  None of the tile has been grouted yet.  And, there was a problem with the tile in the guest bathroom.  Shipped and installed the wrong tile, so it had to be taken down.  So that bathroom is currently tile-less.



The condenser for the A/C was installed.  We were surprised at how big it was compared to the two we have now until we realized it's going to do the work of the two units -- zoned for each floor -- now that we'll have everything on one level.




 To the left are the two windows for the front (my) office.
Photo on the right is the looking down the side.  The first window  (far right) is the second (Alese's) office, then the 3 windows for the living room, and only the second window of the dinning room is visible.



And the final photo (below) is the back of the house.   And, yes it had just started to sprinkle.