Today we got the second coating of stucco, which goes to hold down the molding. That needs to dry -- a couple of days -- then the top coat with color will be done.
Here (on the right ) is the Master shower tile. None of the tile has been grouted yet. And, there was a problem with the tile in the guest bathroom. Shipped and installed the wrong tile, so it had to be taken down. So that bathroom is currently tile-less.
To the left are the two windows for the front (my) office.
Photo on the right is the looking down the side. The first window (far right) is the second (Alese's) office, then the 3 windows for the living room, and only the second window of the dinning room is visible.
And the final photo (below) is the back of the house. And, yes it had just started to sprinkle.